Capacity Equipment

  • Capacity analysis table

    2006 2006 Q2
    Stamping capacity 80 kk/M 80 kk/M
    Stamping equipment 8 8
    Etching capacity 6 kk/M 12 kk/M
    Etching equipment 1 1
    Plating capacity ( Roll ) 75 kk/M 75 kk/M
    Plating equipment ( Roll ) 15 Line 15 Line
    Plating capacity ( Strip ) 12 kk/M 12 kk/M
    Plating equipment ( Strip ) 16 Line 16 Line


  • Production Environment

    Class 1000 clean room area of 300 m2, class 10000 area of 860 m2.
    Deionized water using the resistance value of more than 10MW.
    Semi-finished and finished products storage chamber, temperature and humidity control in ± 2 ℃ and ± 5% RH.
    Measurement equipment and mold parts manufacturing environment, control 0.5 ℃ / hr and 2 ℃ / day。
    The unidirectional production process planning, production control stability conditions :

    •1st floor - 265 m2 : Mold manufacturing / Maintenance / Stamping / Shipping area.
    •2rd floor - 265 m2 : Plating / Sculptured engraving / Gum paste / QC / Finished store.
    •3st floor - 265 m2 : etching / Office area.